Skip to content

fix(workflow): M3 canvas batch — sized-node geometry, container a11y, bulk delete (#14008) - #21930

Merged
mrveiss merged 13 commits into
mainfrom
issue-14409-company-os-canvas-batch
Nov 21, 2026
Merged

mrveiss merged 13 commits into
mainfrom
issue-14409-company-os-canvas-batch

Conversation

@mrveiss

@mrveiss mrveiss commented Nov 21, 2026

Copy link
Copy Markdown
Owner

Closes #14008
Closes #14687
Closes #14749
Refs #14409
Refs #21241
Refs #21242

Thinking Path

The batch covered seven M3 issues. Four needed no code against current main, so this PR carries only the three canvas defects that were still live.

WorkflowCanvas.vue sits at its shrink-only ceiling (2849 lines) and does not grow.

What Changed

  • autobot-frontend/src/components/workflow/WorkflowCanvas.vue
  • autobot-frontend/src/components/workflow/canvasNode.ts (nodeExtent, nodePortY)
  • New specs: WorkflowCanvas.sizedGeometry.test.ts, WorkflowCanvas.containerA11y.test.ts, WorkflowCanvas.bulkDelete.test.ts

5 files. No backend change, no schema change, no locale change.

Verification

  • vitest (src/components/workflow, src/views/llc/__tests__/OrgChart*): 55 files, 495 tests passed.
  • Mutation check: reverting each fix (per-node history push, containers activatable, fixed port height) fails the new specs (7 failures).
  • eslint on the touched files: clean. Frontend file-size guard passed in the commit hooks.
  • vue-tsc: no errors in touched files; the only errors are the missing reka-ui module in the local install.
  • The local install lacks reka-ui, so vitest ran with a scratch alias for that package (not committed); CI uses a full install.

Model Used

Claude Sonnet 5.5

@mrveiss mrveiss added this to the M3 - Refined GUI complete milestone Nov 21, 2026
@mrveiss mrveiss added the phase:M3.7 Company OS, Automation and BI screens label Nov 21, 2026
@coderabbitai

coderabbitai Bot commented Nov 21, 2026 •

Copy link
Copy Markdown
Contributor

Warning

Review limit reached

You've used all free OSS reviews for now. Wait for the free limit to reset to keep reviewing this public repository.

Next included review available in 26 minutes.

Check out review usage here.

View limit details

Limit details: You’ve used the included review currently available.

Learn how review limits work.

Review configuration:

Run configuration

Commits

Reviewing files that changed from the base of the PR and between 2b51014 and 2a9a69e.

Files selected for processing: 6

  • autobot-frontend/src/components/workflow/WorkflowCanvas.vue
  • autobot-frontend/src/components/workflow/__tests__/WorkflowCanvas.bulkDelete.test.ts
  • autobot-frontend/src/components/workflow/__tests__/WorkflowCanvas.containerA11y.test.ts
  • autobot-frontend/src/components/workflow/__tests__/WorkflowCanvas.readonlyGates.test.ts
  • autobot-frontend/src/components/workflow/__tests__/WorkflowCanvas.sizedGeometry.test.ts
  • autobot-frontend/src/components/workflow/canvasNode.ts
  • Autofix · Keep fixing CodeRabbit findings and required CI, and resolving merge conflicts

Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out.

Share

@github-actions

Copy link
Copy Markdown
Contributor

Notice: 29 open PRs — past the runaway threshold (25)

This is not a request to defer this PR. There is no cap on open PRs (#19397) -- nothing blocks opening or pushing a PR.

This notice only means the count is high enough to be worth a glance for a runaway — something opening PRs in a loop, or a merge pipeline that has stalled so nothing is draining.

Currently open:

If the queue is draining normally, ignore this. Otherwise:

  1. Check whether CI is dispatching at all — see the ci-dispatch-watchdog status on these PRs
  2. Approved PRs land through the merge train the coordinator sequences (merge commits, never squash) -- check the open chore(merge-train) PR is moving, not each PR on its own
  3. Look for a loop opening near-identical PRs

Warn-only runaway detector — .github/workflows/pr-queue-gate.yml. It never blocks a merge.

@mrveiss mrveiss changed the title fix(company-os): M3 org chart and canvas batch — workflow create/attach, readonly canvas, a11y, geometry fix(workflow): M3 canvas batch — sized-node geometry, container a11y, bulk delete (#14008) Nov 21, 2026
@github-actions

Copy link
Copy Markdown
Contributor

✅ SSOT Configuration Compliance: Passing

🎉 No new hardcoded values of either class — ssot and other both block.

Known backlog in pipeline-scripts/hardcoded_values_baseline.txt is suppressed and tracked in #14371.

@mrveiss
mrveiss merged commit 8d0c736 into main Nov 21, 2026
62 checks passed
@mrveiss
mrveiss deleted the issue-14409-company-os-canvas-batch branch November 21, 2026 06:10
@mrveiss mrveiss removed the land-next Landing set: CI capacity goes to these PRs first (owner direction 2026-09-18, #15397) label Nov 21, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

phase:M3.7 Company OS, Automation and BI screens

Projects

None yet

1 participant