Repository navigation
Conversation
|
Warning Review limit reachedYou've used all free OSS reviews for now. Wait for the free limit to reset to keep reviewing this public repository. Next included review available in 56 minutes. View limit details
Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. |
✅ SSOT Configuration Compliance: Passing🎉 No new hardcoded values of either class — Known backlog in |
|
Audited zero-file close (owner-approved procedure, 2026-11-21). The train was synced to main with The PR now changes 0 files against main, so all of its content is on main. The full conflict and member tables are in the branch-audit state log. Closing and deleting the branch. |
Thinking Path
Merge train T107: eight approved PRs, no overlap with T106. This merge train is built on current
main.What Changed
Why this shape
M4 first, then oldest-first under the 100-file cap; CI is the gate (owner: no local runs).
Verification
Model Used
Claude Opus 5.5
🤖 Generated with Claude Code