Skip to content

Latest commit

 

History

History

docs

Folders and files

NameName
Last commit message
Last commit date

parent directory

..
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

README.md

Documentation map

This index distinguishes current operating authority from evidence and history. Open the smallest document that owns the question; do not treat every Markdown file in the repository as an instruction to execute.

Authority order

When two documents disagree, resolve them in this order:

  1. exact project or release contracts.md for artifact membership and immutability;
  2. accepted ADRs for repository-level architectural decisions;
  3. the owning skill and its routed reference for engineering procedure;
  4. executable gate behavior and its tests for the implemented predicate;
  5. measured proof/evidence for what has been demonstrated;
  6. journals, improvement entries, plans, and historical reviews for rationale.

Fix the stale higher-level document after confirming the executable behavior. Do not preserve two live procedures as a compatibility workaround.

Start here

Accepted decisions

ADRs govern forward architecture. Supersede an accepted ADR with a later ADR; do not silently rewrite its decision.

ADR Decision
0001 TSX/tscircuit authoring boundary
0002 Native tscircuit/KiCad pipeline
0003 One live status beacon
0004 Gate integrity and non-vacuity
0005 Imported fact authority
0006 Grade fabrication artifacts as the recipient parses them
0007 Claims become executable checks
0008 Declarative stage contract
0009 Clear path for foreign-device fact authority
0010 Retire the unused shared tscircuit module experiment

Measured evidence

These documents explain what was demonstrated at named subjects/commits. They support decisions but do not replace the owning skill procedure.

Evidence Scope
generic-generator-proof.md Generic board generation proof
generic-router-proof.md Generic routing proof
denominator-census.md Coverage/denominator census
pipeline-reliability.md Runtime and reliability measurements
pipeline-shadow-canaries.md Dated rollout/canary evidence; not current authority
fabricated-examples.md Prompt, photograph, and rendering provenance plus claim limits for the README showcase
enclosure-fit-registry.md Cross-project enclosure fit observations, evidence grades, and reusable coupon priors
connector-assembly-registry.md Exact connector/mate/tool/cable combinations, service outcomes, and explicitly unknown fit facts
enclosure-fdm-fleet-audit-2026-08-28.md Role-aware enclosure fleet census, local structural screen, successor-case evidence and qualification limits

Historical plans and snapshots

The following are retained only to explain why current behavior exists. They are not entry points and must not be used as command or ownership authority:

The history/ index records why each retained document is non-authoritative and where its current owner lives.

Git history is the source for earlier versions. Unresolved work harvested from these documents belongs in improvements.md; current procedure belongs in the owning skill reference.

Document classes

Class Mutability Required content
Skill entry Update with current workflow Outcome, quick path, authority routing, invariants
Owning reference Update with current procedure Inputs, actions, outputs, failure/backtrack, runnable validation
Contract Update structurally; sealed copies immutable Allowed artifacts, mutability, validation
ADR Append-only after acceptance Context, decision, consequences, supersession
Proof/evidence Extend or supersede with measured runs Exact subject, method, denominator, result, limits
Improvement Append/update status until closed Owner, landing point, completion evidence
Journal/review Immutable observation after adoption/seal Exact subject and observed result
Historical plan Frozen context Prominent non-authoritative classification

Documentation maintenance

For a PCB workflow change:

  1. change the owning implementation and tests;
  2. update one owning reference and its skill route;
  3. update the declarative graph/catalog if stage composition changed;
  4. record incomplete follow-up work in improvements.md;
  5. run link, authority, contract, and domain tests;
  6. commit implementation, evidence, and documentation at the same green boundary when they describe one change.

Do not add a second quick-reference document. Improve the root README, the skill entry, or the owning reference instead.